SDC Performance UK News
11 June 2013
Kawasaki ZXR400 race project - DAY 9
Day 9 and time we started the assembly, the suspension linkages are in a real mess , the whole lot has been stripped , new bearings fitted where needed and all greased and set up.
Frame and swingarm have been stripped and given a fresh coat of 2K satin black
New swingarm bearings are pressed into place ready for assembly
Finally the frame and engine are put back together again
and finally for today the WP shock that we picked up second hand is fitted.
Category: General News
posted by SDC Performance UK